31 December 2019

2019 Operational Statistics


KF1P Operation Statistics as of the End of 2019

Please consider that KF1P is a modest station running equipment that is probably older than the length of time some have been Ham Radio Operators.  Not one of the antennas is Directional by any stretch of the imagination. 

The station consists of Band-Specific Verticals with the exception of the “End-Fed Somethings”…read the text below.

The 80 Meter Vertical went into operation on 16 December of this year… in the short time KF1P has 66 Countries worked with 51 confirmed.  Also on 80 Meters 49 States Confirmed needing only Hawaii for 80 M WAS.  Note that this is since 16 December of this year…..a whole lot of “BIC-Time” got this…. So close for WAS and some more BIC Time for DXCC before the end of the “Season”….

40 M:  159 Worked, 145 Confirmed;  40M WAS attained
30 M:  61 Worked, 51 confirmed;  30M WAS Need Hawaii for 50
                     30M Antenna is not that good…..
20 M:  175 Worked, 163 Confirmed; 20M WAS Attained
17 M:  121 Worked, 111 Confirmed; 17 Meter WAS Attained
15 M:  65 Worked, 53 Confirmed; 15M WAS Need Alaska for 50
12 M:  …No Real Antenna here…..
10 M:  30 Worked; 30 Confirmed; need AK, ID and RI for 50
Total: 197 Confirmed (LOTW) and 4 “Cards in hand” to get that “200 Sticker” for the DXCC Mixed Certificate.


I do not have “Real Antennas” for15M, 12M and 10M ……I love to call them: “End-Fed-Somethings” for antennas…..They are whatever will take power, “Low SWR” and radiate some signal….I have spent no time on these….

Now to finish up the Hi-Z Directional Receiving array that I was given as a Birthday (July) and Christmas Gift by KK5PL…..then to put up something better on 30 Meters…..

The next project is to figure where to put the four sections of Rohn 25G and to build a Directional antenna for 20-15-10… We did most of the machine work for that when I was in New Mexico in September 2019.

To me it is all about “Goal Setting” to attain the awards….when I activated the 80 Meter Vertical the goal was 40 Countries Worked before 31 December….When that came (and passed) I moved the “Goal Post” a little further…..Next is the 250 Sticker for the Mixed DXCC Certificate. 

If “The Little Station That Can”(KF1P) is able to do this so can YOU…..It requires shifting sleep time….It requires “BIC-Time” (Butt In Chair) and do NOT spare the $$$ on that chair…… Sometimes I sleep in the “Radio Room” and get up at various times to see what is on…..Sometimes I am up real early and sometimes I stay up late…..Set That Goal and Go For It….

‘The Other BoB” KF1P